AFB K-8 Playground Replacement

ADVERTISEMENT FOR BIDS

Uinta County School District #4 will accept sealed proposals for K-8 Playground Replacement, subject to the conditions contained in the General Provisions, Special Provisions and Specifications until February 27, 2024, at 11:30 A.M., at Uinta County School District No.4 Central Office, 129 West Second Street, Mountain View, Wyoming 82939. Bids will then be publicly opened and read aloud. Proposals shall include furnishing all labor, materials, and equipment necessary for performing the work. Proposals will be received for the work as set forth in the bid package.
This project shall consist of removing and replacing the playground area from the K-8 school for the Uinta County School District Number 4. Work shall consist of removing the existing asphalt, playground features, and basketball hoops. Preparation of the subbase and base, pouring new concrete slab along the school building, paving the playground area, replacing the basketball hoops, replacing the tetherball posts, and striping the basketball court, four squares, hopscotch, and tetherball area.
Copies of the plans, specifications and contract documents may be obtained by contacting the office of Uinta Engineering and Surveying, Inc.
808 Main Street
Evanston, Wyoming, 82930
Phone:(307) 789-3602
Fax: 789-6456
These documents will be available electronically for download at no cost, by contacting the Engineer for instructions. A pre-bid meeting will be held on February 20, 2024, at 1:00 p.m. at Mountain View High School, in Mountain View Wyoming.
Wyoming State Statutes apply to the bidding and construction of this Public Works Project including but not limited to the following sections:
W.S. 9-2-304 10% Bid Bond Required
W.S. 16-6-102; 5% Resident Contractor Preference
W.S. 16-6-104; 5% Wyoming Materials and Suppliers Preference
W.S. 16-6-112; Performance Guarantee
W.S. 16-6-201 – 16-6-206; Resident Labor Preference
W.S. 27-3-502(f); Registration with Taxing Authority
The Owner reserves the right to reject all bids and waive any informality in same if the Governing Body determines that it is in the best interest of the Owner to do so. No bidder will be allowed to withdraw their bid for a period of thirty (30) days or until the successful bidder has entered into a contract with the Owner.
The completion date for the project shall be August 2, 2024.